Discover apprenticeships, training programs, and resources for a career in the skilled trades
In LBNL's June 2026 update, US data centers used 192 TWh in 2024, which was 4.7% of US electricity. LBNL's middle estimate projects 649 TWh (11.8%) by 2030, within a range of 9.5–15.3%.
Source: LBNL, US Data Center Energy Usage Report: 2025 Update (June 18, 2026)Data center build-outs and the trade jobs behind them, by email.
Free. Unsubscribe anytime.
Subscribe to updatesWork with wood to build, install, and repair structures
Median pay (BLS, May 2025): $60,580Source: BLS
Install and repair pipes and fixtures for water systems
Median pay (BLS, May 2025): $63,800Source: BLS
Apply paint, coatings, and finishes to surfaces
Median pay (BLS, May 2025): $49,400Source: BLS
Install and maintain electrical power systems
Median pay (BLS, May 2025): $63,190Source: BLS
Install and maintain heating, ventilation, and air conditioning systems
Median pay (BLS, May 2025): $61,010Source: BLS
Build structures with brick, concrete blocks, and stone
Median pay (BLS, May 2025): $62,120Source: BLS